  • 1 Dec 2009 - Turn up to full field
    • Twitter : The LHC has run with solenoid magnets in the ALICE, ATLAS and CMS dectectors turned up to full field.
  • 3 Dec 2009 - Beam commissioning
    • Twitter : LHC running, with beam-commissioning under way again since yesterday evening, following power cut on CERN main site
  • 5 Dec 2009 - Beam commissioning
    • Twitter : LHC beam-commissioning progressing, with first "multibunch" beams last night(2 bunches per beam)
  • 6 Dec 2009 - Stable beams
    • Twitter : LHC has started running with stable beams at 450 GeV?(4 bunches per beam). Collision data is being recored by the experiments.
  • 9 Dec 2009 - Accelerate both beam / Beam commissioning
    • Twitter : Last night the LHC accelerated both beams to 1.18 TeV? with 2 bunches per beam for the first time.
    • Twitter : LHC beam commissioning continues, aiming towards higher intensities at 450 GeV?.
-- GunmoRyu - 07 Dec 2009
Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2009-12-14 - GunmoRyu
 
KOREA-CMS
This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding KoreaCmsWiki? Send feedback